LRT Jabodebek operating system

  • 6th July 2023 GMT+7
Integrated Railroad carriage breakthrough circuit (LRT) enters Jatimulya LRT Depo, Bekasi, West Java, Thursday (6/7/2023). LRT Jabodebek will be operated by communication-based system so that it can be operated from control center and without masinis. ANTARA PHOTO / Early Lingga/Spt.
Related photo
Standard
Image information
Image size
3816x2544
File size
3.19 MB
Created
06/07/2023 17:10 WIB
Photographer
Rivan Awal Lingga
Editor
Saptono