Luwu East
Two staffs are engaged in the stairs of Balambano PLTA in Wasuponda Village, Luwu Timur District, South Sulawesi, Saturday (29/7/2023). PLTA Balambano was built by PT VALE Indonesia Tbk utilized the sungat flow from three lakes, Matano, Mahalona, and Towuti so that it was able to generate electricity by 110 megawatts and 10 megawatts to be channeled in the surrounding community. ANTARA PHOTO/Jojon/nym.
Related photo