DAS utilization for electricity in NTB
A worker checks the discharge of the Sidutan river water for the Hydro Micro Power Plant (PLTMH) Santong, Kayangan District, North Lombok, NTB, Thursday (10/8/2023). PLN NTB utilizes river stream areas (DAS) Sidutan for PLTMH Santong capacity 1,000 kw in the provision of electrical energy while supporting the Renewable Energy and Net Zero Emission Indonesia 2060 program. ANTARA PHOTO/Ahmad Subaidi/nym.
Related photo