The development project of the Cirata Waduk

  • 12th September 2023
Boat crossing next to the Solar Power Generation project (PLTS) floated in Cirata reservoir, Cianjur Regency, West Java, Tuesday (12/9/2023). PLTS is floating in Cirata reservoir with 192 megawatt peak capacity (MWp) which is located in an area of 200 hectares and consists of more than 340 thousand solar panels and is able to produce 245 million kWh clean per year it will be inaugurated at 2023 coming by President Joko Widodo. ANTARA PHOTO/Raisan Al Farisi/hp.
Related photo
Standard
Image information
Image size
4928x3280
File size
3.08 MB
Created
12/09/2023 16:40 WIB
Photographer
Raisan Al Farisi
Editor
Hermanus Prihatna