The development project of the Cirata Waduk
Workers are located at the site of the Solar Power Generation project (PLTS) Floating at Cirata reservoir, Cianjur Regency, West Java, Tuesday (12/9/2023). PLTS is floating in Cirata reservoir with 192 megawatt peak capacity (MWp) which is located in an area of 200 hectares and consists of more than 340 thousand solar panels and is able to produce 245 million kWh clean per year it will be inaugurated at 2023 coming by President Joko Widodo. ANTARA PHOTO/Raisan Al Farisi/hp.
Related photo