Solar Power Generation in Sidoarjo
The East Java Governor Khofifah Indar Parawansa (second right) was witnessed the President Director of PT Tjiwi Kimia Tbk (TKIM) Suhendra Wiriadinata (second left), Deputy CEO of PT Sinar Mas Hendra Jaya Kosasih (left) and President Commissioner PT Indah Kiat Pulp & Paper, Tbk Saleh Husin (right) signed a place when the inauguration of the Solar Power Plant (PLTS) roof 9.8 MWp in PT. Tjiwi Chemical Paper Factory Tbk Sidoarjo, East Java, Monday (2/10/2023). Asia Pulp & Paper Business Unit (APP) Sinar Mas, PT Tjiwi Chemical Paper Plant Tbk (Tjiwi Kimia) operates installation of Solar Power Plant (PLTS) roof mounted on an area of 11.4 hectares (ha) with 8.8 megawatt peak capacity (MWp) to encourage more environmentally friendly business practices and support the achievement of decarbonization targets from the Indonesian Government. ANTARA PHOTO/Umarul Faruq/hp.
Related photo