Sky Bridge development progress in Bogor Station

  • 9th October 2023
A number of workers complete the construction of the connecting layang bridge (Sky Bridge) between Bogor Station and the Paledang Station in Bogor City, West Java, Monday (9/10/2023). The Head of the Fireplace Engineering Hall (BTP) Bandung Chandrawan Adhiputranto declared the progress of the development of the Sky Bridge Bridge station Bogor-Stasiun Paledang Bridge has reached 65 percent with the target finished on December 2023 and began operating on January 2024. ANTARA PHOTO/Arif Firmansyah/nz
Related photo
Standard
Image information
Image size
5000x3333
File size
4.02 MB
Created
09/10/2023 13:45 WIB
Photographer
Arif Firmansyah
Editor
Zarqoni Maksum