Nelayan uses PLTS to save the cost of melaut
Nelayan connects electrical cable with solar panel on the ship in the port area of Baai, Bengkulu City, Wednesday (8/11/2023). Nelayan with a ship sized 6 gross tons (GT) up to 20 GT in the region began to migrate from the use of aki to solar power plants (PLTS) to save the cost when shrinking. ANTARA PHOTO/Muhammad Izfaldi/aww.
Related photo