PLTA Bili-Bili stops while operating due to dry

  • 23rd November 2023 GMT+7
Water Power Generation (PLTA) Bili-Bili that stops while operating in Gowa Regency, South Sulawesi, Thursday (23/11/2023). PLTA with a power of 19,5 megawatts (MW) stopped operating for the last two months due to the supply of water from the Bili-Bili dam on it shrinks drastically from the normal eight cubic meters per second to two cubic meters per second as the impact of the dry season separated the phenomenon of El Nino. ANTARA FOTO/Arnas Padda/Spt.
Related photo
Standard
Image information
Image size
4585x3056
File size
2.51 MB
Created
23/11/2023 11:05 WIB
Photographer
Arnas Padda
Editor
Saptono