FACTORY INAUGURATION

  • 6th April 2012 GMT+7
LAMANDAU, 6/4 - FABRIC PERESMIAN. Director of Gamal Nasir MS (second left) and Bupati Lamandau Marukan (right), witnessed Commissioner Triputra Agro Persada (TAP) Toddy M. Sugoto (left), and CEO of TAP Area Kalteng Tjandra Karya Hermanto (second right) presses sirine marks the inauguration of oil palm plant PT. First Lamandau Timber International (FLTI), which is combined in TAP Group, in loading the company's ramp, Batu's Stair Village, Belantikan Raya District, Lamu Regency, Central Kalimantan, Wes/4). With the operation of FLTI factory, the number of TAP factories operating into five units with a total capacity of 255 tons per hour. The total area of TAP Group reaches 298.853 hectares, 110.868 hectares include oil palms of superior varieties and 62.299 hectares have been produced. ANTARA/Gani/Spt/12
Related photo
Standard
Image information
Image size
2483x1785
File size
2.3 MB
Created
06/04/2012 16:55 WIB
Photographer
Gani
Editor