Agriculture di Maros elektrification program

  • 10th January 2024
Petani checked the power supply station in the village rice fields of Toolsengae, Bantimurung District, Maros Regency, South Sulawesi, Wednesday (10/1/2024). PLN South Sulawesi Distribution Induk Unit, Southeast Sulawesi and West Sulawesi (UID Sulselrabar) has realized the electrifying agriculture (EA) program or agricultural electrifying utilised 3.290 farmers in efforts to increase productivity of agricultural sectors that bring significant impact on harvest results and operational cost savings. ANTARA PHOTO/Hasrul Said/YU/aww.
Related photo
Standard
Image information
Image size
5000x3333
File size
1.58 MB
Created
10/01/2024 08:35 WIB
Photographer
Hasrul Said
Editor
Andika Wahyu