Hydrotherapy

  • 9th February 2024 GMT+7
People see the condition of the Biomass Power Generation (PLTBm) made bamboo fuels scaled in Madobag Village, South Siberut, Mentawai Islands Regency, West Sumatra, Friday (9/2/2024). The first PLTBM in Indonesia is inaugurated in 2019, along the two units again only operate for six months with a total capacity of 700 kW to illuminate 1.233 Head of Family (KK), but is now scaled and mangkrak, previously experienced the constraints of supply and damaged machines. ANTARA PHOTO/Iggoy el Fitra/rwa.
Related photo
Standard
Image information
Image size
5000x3333
File size
2.45 MB
Created
09/02/2024 17:45 WIB
Photographer
Iggoy El Fitra
Editor
Puspa Perwitasari