First IPAL operation in eastern Indonesia

  • 22nd February 2024 GMT+7
The officer conducts monitoring in Wastewater Treatment Installation (IPAL) Losari who has been inaugurated President Joko Widodo in Makassar, South Sulawesi, Thursday (22/2/2024). IPAL Losari built the Ministry of Public Works and Housing of People (PUPR) with a capacity of 16 thousand cubic meters per day and is the first in Indonesia the eastern part began to be operated that is expected to increase the health degree of society, keeping soil and raw water quality as well as creating a clean environment in the region. ANTARA PHOTO/Arnas Padda/aww.
Related photo
Standard
Image information
Image size
5000x3333
File size
3.08 MB
Created
22/02/2024 11:05 WIB
Photographer
Arnas Padda
Editor
Andika Wahyu