RENGAT PLTMG OPERATE

  • 2nd May 2012
RIAU, 2/5- BEROPERATION RENGAT . Director of Operation of Indonesia Barat PLN, Moch Harry Jaya Hero (left), Bupati Indragiri Hulu, Yopi Arianto (right) and General Manager of PLN Riau Region and Riau Islands, Djoko Raharjo Abumanan (mid) reviewed the Gas Mini Power Plant Machine (PLTMG) inaugurated in the village of Lirik, Indragiri Hulu, Riau, Wednesday (2/5). Power supply 20 Mega Watt (MW) to supply power requirements to Rengat electrical systems. With the operation of the Rengat rental PLTMG located in Lirik area - Indragiri Hulu, PLN stops the operation of 10 Diesel Power Electric Center (PLTD) with a total power of 11.5 MW which is currently using solar fuel. The potential for savings that PLN can reach Rp. 79 billion per year. ANTARA/Audy Alwi/ama/12
Related photo
Standard
Image information
Image size
1500x963
File size
248.33 KB
Created
02/05/2012 17:35 WIB
Photographer
Agus
Editor