Preparation of the fleet of the ships of the mud flow in Kepri

  • 30th March 2024 GMT+7
Passenger ships crossed in the Punggur Telaga Port watering area, Batam, Riau Islands, Saturday (30/3/2024). Dihub Kepri has prepared as many as 214 units of cruise ships between islands and between provinces to anticipate the passenger spikes that are estimated to reach three million people when crossing the width. ANTARA PHOTO/Teguh Prihatna/wpa.
Related photo
Standard
Image information
Image size
5000x3333
File size
3.32 MB
Created
30/03/2024 14:45 WIB
Photographer
Teguh Prihatna
Editor
Wahyu Putro A