Power supply Java Mature Bali on Width 2024
PLN President Director (Persero) Darmawan Prasodjo (right three) combined with workers when reviewing the Paiton PLTU in Probolinggo, East Java, Friday (5/4/2024) night. PLN maintains an installed capacity of 21 gigawatts of a total capacity of 45 gigawatts to guarantee electricity supply in the Java, Madura, and Bali area during the 1445 Mitigation Eid. ANTARA PHOTO/Rizal Hanafi/nz
Related photo