Power supply Java Mature Bali on Width 2024

  • 6th April 2024 GMT+7
PLN President Director (Persero) Darmawan Prasodjo (right three) combined with workers when reviewing the Paiton PLTU in Probolinggo, East Java, Friday (5/4/2024) night. PLN maintains an installed capacity of 21 gigawatts of a total capacity of 45 gigawatts to guarantee electricity supply in the Java, Madura, and Bali area during the 1445 Mitigation Eid. ANTARA PHOTO/Rizal Hanafi/nz
Related photo
Standard
Image information
Image size
5000x3334
File size
2.03 MB
Created
06/04/2024 10:00 WIB
Photographer
Rizal Hanafi
Editor
Zarqoni Maksum