Swim track to Bengkulu armg
A number of vehicles in the Toll road Trans Sumatra Ruas Lubuklinggau-Bengkulu sexy I Bengkulu-Taba Penanjung in Bengkulu City, Bengkulu, Saturday (6/4/2024). Entering the H-4 Hari Raya Edul Fitri 1445 Hijriah, the landing path towards the City of Bengkulu is still armg with the volume of vehicles since H-7 to date as much as 4.183 vehicles and predicted increased by 20 percent at the upcoming H-2 compared to the peak of the mudic current in the previous year’s width. ANTARA PHOTO/Muhammad Izfaldi/Spt.
Related photo