Passenger train at KAI Daop 8 Surabaya
A number of passengers waiting for the arrival of railways at Surabaya Gubeng Station, Surabaya, East Java, Monday (15/4/2024). PT Kereta Api Indonesia (KAI) Daop 8 Surabaya recorded as 30.115 passengers dropped in various stations in the work area and departing as much as 20.349 passengers on this day (15/4), while in the transportation period of width at 31 March-21 April 2024 as many as 418.649 tickets that have been sold. ANTARA PHOTO/Didik Suhartono/YU
Related photo