KRACAK PLTA TREATMENT
BOGOR, 30/5-PRODUCTION OF KRACAK. A worker checks the exciter machine used as one of the Kracak plant PLTs in Leuwiliang, Bogor, Jabar, Wednesday (30/5). PLTA Kracak operates since 1926 has a installed capacity of 18.9 Megawatt utilizes the flow of the Cianten river and the Cikulung river remains preserved until today as a PLN commitment to optimize the utilization of renewable power generation so that it can replace fuel. ANTARA/Jafkhairi/s/ama/12
Related photo