17 percent electric Suralaya donbang PLTU in Java-Bali

  • 31st July 2024
Farmers spray insecticides to eradicate pests in rice fields around Steam Power Plant (PLTU) Suralaya, Cilegon, Banten, Wednesday (31/7/2024). The Suralaya PLTU has seven plant units with a total installed capacity of 3.400 MW is capable of weighing 17 percent of electrical energy for the needs of Java with a transmission of 500 kV, the plant consumes coal more than 35,000 tons per day. ANTARA PHOTO/Predipta/Spt.
Related photo
Standard
Image information
Image size
5000x3333
File size
2.34 MB
Created
31/07/2024 17:55 WIB
Photographer
Galih Pradipta
Editor
Saptono