ORTHOTROPIC BRIDGE

  • 20th June 2012
BREBES, 20/6 - ORTOTROPIK WARRANTY. Director of Jendral (Dirjen) Bina Marga Ministry of Public Works (PU), Djoko Murjanto (second right) review the repair of orthotropic bridges on the pantura path, Brebes, Jateng, Tuesday (19/6). Director General Bina Marga said, the orthotropic bridge is one of the trial bridges using a steel plate frame that will be applied elsewhere and the repair is targeted finished before the month of Ramadan. PHOTO ANTARA/Oky Lukmansyah/Koz/mes/12.
Related photo
Standard
Image information
Image size
3600x2318
File size
1.55 MB
Created
20/06/2012 10:45 WIB
Photographer
Oky Lukmansyah
Editor