Benefits of solar power plants in Nusa Penida Island

  • 22nd October 2024 GMT+7
Two PLN officers of Indonesia Power UBP Bali checked the point of solar panel at the Solar Power Plant (PLTS) in Nusa Penida Island, Klungkung, Bali, Tuesday (22/10/2024). The PLTS provides an environmentally friendly clean energy source with a capacity of 3.5 MWac to meet the needs of electrical energy in three nusa namely Nusa Penida, Nusa Lembongan, and Nusa Ceningan and supporting tourism activities on the island. ANTARA FOTO/Nyoman Hendra Wibowo/foc.
Related photo
Standard
Image information
Image size
5000x3333
File size
2.43 MB
Created
22/10/2024 20:00 WIB
Photographer
Nyoman Hendra Wibowo
Editor
Fanny Octavianus