PIS modification ballast water and bollard on Gamsunoro tanker

  • 26th October 2024 GMT+7
VP Technical Fleet Pertamina International Shipping (PIS) I Gusti Ngurah Handiyana reviewed the docking of Gamsunoro tanker in Kuzey Star Shipyard, Tuzla, Istanbul, Turkey, Friday (25/10/2024). Docking Gamsunoro ships will be finished on 29 October 2024 with a number of modifications, including upgrading on the ballast water system as well as bollard to be able to pass the Panama Forward. ANTARA FOTO/Puspa Perwitasari/nz
Related photo
Standard
Image information
Image size
5568x3712
File size
2.57 MB
Created
26/10/2024 12:58 WIB
Photographer
Puspa_perwitasari
Editor
Zarqoni Maksum