PIS modification ballast water and bollard tanker Gamsunoro

  • 26th October 2024 GMT+7
VP Technical Fleet Pertamina International Shipping (PIS) I Gusti Ngurah Handiyana (second left) combined with Manager Corporate Communication and Relations PIS Vega Ribbon (second right) and two PIS officers when reviewing the docking of the Gamsunoro tanker, in Kuzey Star Shipyard, Tuzla, Istanbul, Turkey, Friday (25/10/2024). Docking Gamsunoro ships will be finished on 29 October 2024 with a number of modifications, including upgrading on the ballast water system as well as bollard to be able to pass the Panama Forward. ANTARA FOTO/Puspa Perwitasari/nz
Related photo
Standard
Image information
Image size
5568x3712
File size
2.67 MB
Created
26/10/2024 12:59 WIB
Photographer
Puspa_perwitasari
Editor
Zarqoni Maksum