BROKEN PLATU.

  • 23rd January 2008 GMT+7
PALU, 23/1 - RUSSIA A number of Panau PLTU staff, Palu, Central Sulawesi, Wednesday (23/1) power distribution in Distribute Control System (DCS). One of the two PLTU machines supplying by 26 MW has a damage that makes nearly 50 percent of the need of lactating in Palu at peak loads cannot be met. PLN Palu is forced to do a milled outage to follow it. PHOTO ANTARA/Basri Marzuki/pd/08
Related photo
Standard
Image information
Image size
2048x1362
File size
247.16 KB
Created
23/01/2008 17:24 WIB
Photographer
Basri Marzuki
Editor