COAL SHIP

  • 7th September 2012 GMT+7
JEPARA, 7/9 - KAPAL BATU BARA. President Commissioner of PT. Arpeni Pratama Ocean Line (APOL) Tbk Sarwono Kusumaatmadja (two left), along Dirut APOL Iriawan Ibarat (two right), Operation Director APOL Lars Gruenitz (left), Dirut PT. Central Java Power Koji Endo (right), and GM PLN Tanjung Jati B D.G.N. Ambara (mid), when the operation of the new ship carrier of MV Dewi Parwati coal in the Steam Power Plant Dermaga (CheTU) (7/7). Operation of MV Goddess Parwati ship to meet coal supply contract for Tanjung Jati B PLTU for 15 years with contract value of Rp3,08 trillion. PHOTO ANTARA/R. Rekotomo/Koz/pd/12.
Related photo
Standard
Image information
Image size
3578x2179
File size
870.54 KB
Created
07/09/2012 15:45 WIB
Photographer
R.rekotomo
Editor