BROKEN ORTHOTROPIC BRIDGE

  • 12th September 2012 GMT+7
BREBES, 12/9 - ORTOTROPIK WARRANTY. A number of workers complete the welding of steel plate bridge times the idler that was again damaged on the pantura line, Brebes, Jateng, Wednesday (12/9). The orthotropic bridge is one of the trial bridges using the steel plate frame back to be damaged at a number of points, so that the traffic current of both jam and heavy vehicles from the west direction is transferred to the south-side bridge. PHOTO ANTARA/Oky Lukmansyah/ed/ama/12
Related photo
Standard
Image information
Image size
3600x2391
File size
1.31 MB
Created
12/09/2012 20:30 WIB
Photographer
Oky Lukmansyah
Editor