PANTURA BRIDGE CLOSED
BREBES, 19/9 - PANTURA WARRANTIES INTUP. A number of motor vehicles cross the side of the steel plate bridge times the idler that traps on the pantura line, Brebes, Jateng, Wednesday (19/9). The trial bridge uses a frame of steel plate experiencing a gap (bolong) back for 2 meters, so it is closed for heavy vehicles and traffic flows from both jam directions along 5 kilometers as well as the condition is very harming the vehicle that crosses. PHOTO ANTARA/Oky Lukmansyah/ed/ama/12
Related photo