WATER ELEVATION RESERVOIR

  • 5th October 2012 GMT+7
WONOGIRI, 5/10 - AIR WADUK ELEVASI. Workers run heavy equipment to dredge the sedimentation of the Mungkur elephant reservoir that experienced a decrease in water volume in Wonogiri, Central Java, Friday (5/10). Water height (elevation) Gajah Mungkur reservoir is currently 127,60 meters lead to turbine closure (water plate) which serves as irrigation and PLTA due to its normal massage limit is 131.05 meters above sea level (dpl). PHOTO ANTARA/Herka Yanis Pangaribowo/Koz/mes/12.
Related photo
Standard
Image information
Image size
5184x3180
File size
914.41 KB
Created
05/10/2012 15:50 WIB
Photographer
Herka Yanis Pangaribowo
Editor