REPAIR OF CRL ELECTRICAL NETWORKS.

  • 10th December 2012
BOGOR, 10/12-PRODUCED NETWORK. A number of workers repair the KRL electrical network at the Cilebut, Bogor, Jabar, Monday (10/12). The repair of electrical networks and reinstallation of rails that have been disconnected due to the longsor to accelerate the re-operation of two KRL Jakarta-Bogor lines and vice versa PHOTO ANTARA/Jafkhairi/s/12
Related photo
Standard
Image information
Image size
2782x1762
File size
408.63 KB
Created
10/12/2012 17:10 WIB
Photographer
Jafkhairi
Editor