BRIDGE BREAK.

  • 4th March 2013 GMT+7
DELIVERY, 4/3- PUTUS WARRANTY. People witness the roboh bridge in Mondo Village, Mojo, Kediri, East Java, Monday (4/3). The bridge on the alternative path that connects the Regency of Kediri and Tulungagung Regency is broken due to the drap of water. The result of the disconnection of the bridge should be rotated throughout 15 kilometers. ANTARA/Rudi Mulya/EI/s/nz/13
Related photo
Standard
Image information
Image size
3504x2272
File size
1.29 MB
Created
04/03/2013 20:30 WIB
Photographer
Rudi Mulya
Editor