GAS PRODUCTION

  • 7th June 2013 GMT+7
Two workers installed a series of iron for the construction of the rig that will be used for drilling in the well of North Central Java gas (NCJ) A4, in the village of Mangkang Kulon Semarang, Jateng, Friday (7/6). The drilling performed by the EP Pertamina with a depth target of up to 1.560 meters is expected to produce gas by 2 million standard gas cubic feet per day (MMSCFD). ANTARA PHOTO/R. Rekotomo/Koz/pd/13.
Related photo
Standard
Image information
Image size
2090x3088
File size
307.11 KB
Created
07/06/2013 18:50 WIB
Photographer
R. Rekotomo
Editor