THE PANTURA BRIDGE IS BROKEN BACK

  • 29th July 2013 GMT+7
A number of workers complete the perforated multiplier bridge welding on the pantura line, Brebes, Jateng, Monday (29/7). At H-10 the boiler bridge located on the pantura line is broken back, so it makes the jam and harm the flow of the mudr that crosses. ANTARA PHOTO/Oky Lukmansyah/ss/mes/13
Related photo
Standard
Image information
Image size
3600x2266
File size
1.12 MB
Created
29/07/2013 19:40 WIB
Photographer
Oky Lukmansyah
Editor