TOLL DRILL

  • 30th July 2013 GMT+7
A number of vehicles crossing in the construction location of Bogor Ring Road toll road (BORR) sexy IIA hoods of hoods in the development stage in Kedunghalang, Bogor City, Jabar, Tuesday (30/7). The 1,95 km toll road which is the continuation of the hot I toll BORR along 3.8 km connecting Sentul-dunghalang will operate in early 2014 to come with the concept of a layang road. ANTARA PHOTO/Jafkhairi/pd/13
Related photo
Standard
Image information
Image size
3008x2000
File size
674.15 KB
Created
30/07/2013 14:40 WIB
Photographer
Jafkhairi
Editor