DOUBLE RAILWAY LINE

  • 18th September 2013
Director General Director General of Kemehub's Speech with Mitsubishi Sumitomo Joint Operation officers checked infrastuktur and equipment in Bekasi Station, Jabar, Wednesday (18/9). The check is done before the receipt of the construction of the Cikarang-Bekasi double rail path which includes the construction of Bekasi station, East Bekasi, Tambun, Cibitung and Cikarang as well as the construction of the top-level electric substation signals and communication facilities. ANTARA PHOTO/Paramayuda/Spt/13
Related photo
Standard
Image information
Image size
3000x1982
File size
1.18 MB
Created
18/09/2013 12:25 WIB
Photographer
Paramayuda
Editor