ELECTRIC GRID

  • 20th September 2013 GMT+7
A worker conducts electrical network repair, in Semarang, Jateng, Friday (20/9). The repair that includes the replacement of the cable channels and electrical poles in a number of locations will take time for a month. ANTARA PHOTO/R. Rekotomo/s/pd/13.
Related photo
Standard
Image information
Image size
2003x3016
File size
323.79 KB
Created
20/09/2013 17:20 WIB
Photographer
R. Rekotomo
Editor