CONCRETE FLOOR INSTALLATION
A number of workers complete the repair of the boiler bridge on the Brebes pantura line, Jateng, Monday (30/9). The installation of concrete floors on the repair of Jakarta's connecting boilers - Central Java throughout 102 meters has reached 30 percent with the final target of November finished. ANTARA PHOTO/Oky Lukmansyah/Koz/ama/13.
Related photo