AMINE LNG REGASIFICATION PROJECT
Heavy equipment is operated when the regasification project regasification stage of Arun LNG in Lhokseumawe, Aceh, Saturday (9/11). Pertamina through subsidiary PT Perta Arun Gas allocated 570 million US dollars for the LNG regasification terminal project 405 mmSCFD lie the construction of Arun-B gas pipe by synergizing seven BUMN and one BUMD and the terminal is targeted to operate on October 2014. ANTARA PHOTO/Wahyu Putro A/s/ama/13
Related photo