PORT PACKING CURRENT

  • 28th December 2013 GMT+7
The loading and unloading activity in the container terminal, Makassar, Sulsel, Saturday (28/12. PT. Pelindo IV recorded the realization of the three-year quarter-packing current 2013 Makassar’s packaging terminal increased by 5.57 percent, namely 405.230 perceived in the same period in 2012, namely 383.855 teus. Target up to late 2013 reached 531.309 teus. ANTARA PHOTO/Dewi Fajriani/ed/13
Related photo
Standard
Image information
Image size
3618x2316
File size
1.17 MB
Created
28/12/2013 13:10 WIB
Photographer
Dewi Fajriani
Editor