ELECTRIC BRICK PRODUCTION

  • 28th December 2013
Gas Power Plant Activities (PLTG) Panaran, Batam, Saturday (28/12). Bright PLN Batam is currently capable of supplying electricity requirements of 392 MW with a peak load of 310 MW, the fuel power plant is 70 percent using gas and 30 percent using coal. ANTARA PHOTO/Wahyu Putro A/s/ama/13
Related photo
Standard
Image information
Image size
3863x2570
File size
1.53 MB
Created
28/12/2013 17:30 WIB
Photographer
Wahyu Putro A
Editor