JATIKAS FIGHT
The motorbike rider crosses in the construction project location of Jatikara reservoir in Semarang, Jateng, Monday (13/1). The construction of reservoirs occupying an area of 266 hectares and is built with an investment fee of Rp. 599 billion it is still controlled with the issue of high-voltage Air Duct pole transfer (SUTT) at the water shelter location. ANTARA PHOTO/R. Rekotomo/ed/Spt/14.
Related photo