JATIKAS FIGHT

  • 13th January 2014 GMT+7
Heavy equipment is used to do land dredging in the construction project location of Jatikara reservoir, in Semarang, Jateng, Monday (13/1). The construction of reservoirs occupying an area of 266 hectares and is built with an investment fee of Rp. 599 billion it is still controlled with the issue of high-voltage Air Duct pole transfer (SUTT) at the water shelter location. ANTARA PHOTO/R. Rekotomo/ed/Spt/14.
Related photo
Standard
Image information
Image size
3002x1806
File size
1.2 MB
Created
13/01/2014 14:20 WIB
Photographer
R. Rekotomo
Editor