REALIZATION STORAGE CNG MUARA FRESH

  • 17th March 2014 GMT+7
Dirut PT.PLN (Persero) Tbk Nur Pamuji (left three) combined with Dirut PT.PP (persero) Tbk Bambang Tri Wibowo (left), Dirut PT.PJB Amir rosidi (second left), President Commissioner PT.PJB Toyo Riawan (right) on the "Storage CNG Muara Offer" in Bekasi, West Java, Monday (17/3). Storage CNG plant is built as a fuel usage device in Gas Power Plant (PLTG) for power generations providing electrical energy. ANTARA PHOTO/Muhammad Adimaja/Asf/nz/14.
Related photo
Standard
Image information
Image size
3000x2000
File size
845.43 KB
Created
17/03/2014 16:10 WIB
Photographer
Muhammad Adimaja
Editor