CURRENT LAPINDO MUD SMELTING CONDITIONS

  • 19th March 2014
Photo from air condition center smelting mud Lapindo, in Sidoarjo Hall, Wednesday (19/3). Sidoarjo (BPLS) sludge management body is ready to stand 24 hours at the smelting location because it is worried about the sludge of smuggling and stimulating the embankment, reflecting the rainfall is quite high in Sidoarjo Regency. ANTARA PHOTO/Eric Ireng/s/pd/14
Related photo
Standard
Image information
Image size
3500x2041
File size
2.03 MB
Created
19/03/2014 18:20 WIB
Photographer
Eric Ireng
Editor