REJECT ELECTRIC OUTAGES
A number of students conduct silent action rejects the power outages at the Bright PLN Batam Office, Wednesday (7/5). Ten students from a variety of campuses rejected agile electricity suppression policy carried out Bright to nurtur a thorough treatment (overhaul) at the Tanjung Kasam 55x2MW PLTU plant that reduces the supply of power of 55MW from a total of 340MW at the peak load of Batam City by 320MW, and the outage was carried out since May 5-12 of the upcoming June. ANTARA PHOTO/Joko Sulistyo/Asf/ama/14.
Related photo