PLATU TREATMENT OPAQUE

  • 12th May 2014
A number of technicians from China are dismantling turbines on Steam Power Generation (PLTU) Tanjung Kasam 55x2MW in Batam, Monday (11/5). The maintenance of a thorough annual machine (overhaul) led to a power supply reduced by 55MW from a total of 340MW at a peak load of 320MW so that the Bright PLN Batam applied a grinding outage. ANTARA PHOTO/Joko Sulistyo/ed/pd/14
Related photo
Standard
Image information
Image size
2048x1350
File size
1.25 MB
Created
12/05/2014 20:13 WIB
Photographer
Joko Sulistyo
Editor