PRE CONSTRUCTION BRIDGE MUSI

  • 13th May 2014 GMT+7
A number of team members conduct depth surveys and river water advances by using "echosounder" in Musi River ban, Palembang, Sumsel, Wednesday (13/5). The survey is a pre-development survey of Musi IV bridge projected to reduce Ampera bridge load. ANTARA PHOTO/ Feny Selly/ed/mes/14
Related photo
Standard
Image information
Image size
3000x1996
File size
1.22 MB
Created
13/05/2014 20:02 WIB
Photographer
Feny Selly
Editor