GAS PERTAMINA PIPE INSTALLATION
Presdir Pertamina Gas Hendra Jaya (left) review pipe installation to drain gas from Muara Karang to Muara Offer in the Bonded Area of Nusantara Cilincing, North Jakarta, Friday (23/5). The 30-km-diameter 24-inchi pipeline development project with 270 mmscfd capacity by Pertamina Gas that cooperates with the consortium of Hutama Karya, Moeladi and Promatcon to stream gas regasification floating storage regasification unit West Java to PLN in Muara Offer and a number of industries in West Java at a fee of Rp.75,83 billion and is planned to operate in the second quarter of 2015. ANTARA PHOTO/Wahyu Putro A/Asf/Spt/14.
Related photo