INDIAN POWER
A officer examined one of the turbine units in Gardu Induk PLTA Lamajan, Pangalengan, Bandung Regency, West Java, Friday (20/6). PLTA Lamajan was operated since 1925 with an installed capacity of each 6.87 MW including the business unit of the Se-Jawa and Bali electricity. ANTARA PHOTO/Novrian Arbi/s/nz.14
Related photo