DOWN DREDGING BRIDGE

  • 19th July 2014
Heavy equipment finishes soil dredging under the bridge slating on the Comal pantura line, Crosser, Jateng, Saturday (19/7). Dredging the ground on the North bridge to be made a temporary buffer concrete, so that H-3 is ready to go through a motorcycle and private car mud flow vehicle. ANTARA PHOTO/Oky Lukmansyah/ss/mes/14
Related photo
Standard
Image information
Image size
3600x2391
File size
1.45 MB
Created
19/07/2014 15:50 WIB
Photographer
Oky Lukmansyah
Editor